domefalo.blogg.se

For ipod instal Metro 4
For ipod instal Metro 4












for ipod instal Metro 4

Over 1 km (0.62 mi) of the line passes over water bodies in Bhakti Park and Wadala, both areas classified as CRZ II, where regulations limit construction activities. The Maharashtra Coastal Zone Management Authority granted Coastal Regulation Zone (CRZ) clearance to the project in February 2017. The foundation stone for Metro 4 was laid by Prime Minister Narendra Modi on 24 December 2016. The project was estimated to cost ₹14,549 crore (US$1.8 billion). Chief Minister Devendra Fadnavis approved the proposal to build Line 4 on 3 June 2016, and the Maharashtra Cabinet cleared the project on 27 September 2016. In June 2015, the Mumbai Metropolitan Region Development Authority (MMRDA) proposed building a 32 km Wadala-Thane-Kasarvadavali metro line as part of a plan to build 6 new metro lines at a total estimated cost of ₹64,000 crore (US$8.0 billion). Alstom awarded to provide rolling stock for this line, but the contract has been cancelled in March 2022 due to delays and uncertainties of the project. It will reduce the current travel time by between 50% and 75% depending on road conditions. Dedicated depots are planned in Owale land in up to an extent of 20 ha. It will provide rail based access to the commercial, government bodies and geographical landmarks in Mumbai. It is expected to be completed in 2022 and is expected to provide interconnectivity among the existing Eastern Express Highway at Chembur, Central Railway, Mono Rail, the ongoing Metro Line 2B (D N Nagar to Mandale) at Chembur, and the proposed Metro Line 5 (Thane to Kalyan) at Kapurbawdi, Metro Line 6 (Swami Samarth Nagar to Vikhroli) in Kanjurmarg and Metro Line 11 (Wadala to CSMT) in Wadala. Its construction was expected to begin by June 2018. The 32.32 km (20.08 mi) line is planned to be fully elevated, and is expected to consist of 32 stations from Wadala ( Mumbai) to Kasarvadavali ( Ghodbunder road, Thane) via Chembur, Bhandup Mulund and Teen Hath Naka, a popular traffic crossing in Thane. Green Line 4 of the Mumbai Metro, currently under construction, is part of the metro system for the city of Mumbai, India and is being developed by MMRDA and a consortium of international companies.














For ipod instal Metro 4